Repairing of metal guard rails on Roseau bridge: Contract Document
Material type:
TextPublisher: Roseau : Ministry of public works & ports, December 2016Description: [24 p.] tblsSubject(s): Contracts | Contracting | Project Documents | Bridges | Physical Infrastructure | DominicaSummary: The ministry & public works and ports of the government of the Commonwealth of Dominica issued a contract document in December 2016 for the repair of metal guard rails of the Roseau bridge. The document outlines the project scope, technical specification, required materials , and safety standards for restoring the bridge protective nail system. It details contractor responsibilities, timelines, and compliance requirements to ensure structured integrity, public safety, and adherence to national engineering and construction guidelines.
| Item type | Current location | Call number | Status | Date due | Barcode |
|---|---|---|---|---|---|
| Grey Literature | National Documentation Centre Communication and Works | 00821-CW (Browse shelf) | Available | NDC25120007 |
Browsing National Documentation Centre shelves, Shelving location: Communication and Works Close shelf browser
The ministry & public works and ports of the government of the Commonwealth of Dominica issued a contract document in December 2016 for the repair of metal guard rails of the Roseau bridge. The document outlines the project scope, technical specification, required materials , and safety standards for restoring the bridge protective nail system. It details contractor responsibilities, timelines, and compliance requirements to ensure structured integrity, public safety, and adherence to national engineering and construction guidelines.
Restricted
There are no comments on this title.