Dominica temporary water supply feasibility study.

By: Shankland Cox Partnership
Contributor(s): Wallace Evans and Partners
Material type: TextTextPublisher: London: Shankland Cox Partnership, August 1973Description: 18 p. illsSubject(s): Feasibility Studies | Water Supply | Dominica | Water Management | Water | DominicaSummary: In March 1973 the Development and Planning Corporation requested Shankland Cox Partnership to prepare a feasibility study for a temporary water supply scheme for the first stage of development at the Cabrits Resort area at Portsmouth, The study is an assessment of the practicability of providing such a temporary water supply at Cabrits Resort Portsmouth, to supply 300,000 US gallons of water per day.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
Grey Literature National Documentation Centre
Dominican Collection
02504-DM (Browse shelf) Available NDC24070016

In March 1973 the Development and Planning Corporation requested Shankland Cox Partnership to prepare a feasibility study for a temporary water supply scheme for the first stage of development at the Cabrits Resort area at Portsmouth, The study is an assessment of the practicability of providing such a temporary water supply at Cabrits Resort Portsmouth, to supply 300,000 US gallons of water per day.

General.

There are no comments on this title.

to post a comment.

Powered by Koha